fitz

Fitzoy Place - London

READ MORE

foksal

Foksal Gallery Foundation - Warsaw

READ MORE

tour-bleue

Tour bleue - Charleroi

READ MORE

viva bahriya

Viva Bahriya Pearl - Dubaï

READ MORE

Athletes-village

ATHLETES VILLAGE - LONDON

READ MORE

Fixinox communiqué following the Grenfell tower fire

  • 26.06.2017

The Grenfell Tower tragic fire does not condemn the use of ventilated external cladding for the construction /refurbishment of energy efficient facades. The disaster shows that choosing the wrong material can be a fatal mistake. Fixinox intends to e...

READ MORE

BIM : Building Information Modeling

  • 20.03.2017

Construction has been evolving continuously over the past 30 years. Thus, the progressive virtualization of the drawings, calculations, projects design have changed the way buildings are projected and constructed compared to 10, 30 or 50 years ago. A...

READ MORE

CE Marking – We are now EN 1090 certified

  • 13.02.2017

Following our constant improvement of our quality policy, we have successfully applied to the EN 1090-2 Standard that concerns production and quality control. The compliance with this new standard allows us to publish Declaration of Performance (or D...

READ MORE

Technical approval (French) for seimic areas – Sandwich panel anchors

  • 5.01.2017

    We are glad to announce that we go tour second Technical approval for the French territory for our anchoring system for sandwich panels. We have been working along with the CSTB (French EOTA Organism) at improving the system and got certified f...

READ MORE

Winter holidays

  • 1.12.2016

FIXINOX offices will be closed from December 24th 2016 to January 8th 2017. Any requests during the winter break can be sent to info@fixinox.be Outside of these dates, the office will be running as usual, the FIXINOX team remains at your service.

READ MORE

Follow us!

Articles récents

  • Winter holidays

    1.12.2016