Architects : Atelier Jean Nouvel

CUstom Engineering

READ MORE

Thermal bridges – A case study

  • 23.05.2023

Structural thermal bridges are definitely not to be ignored. We were consulted on a project in Lyon, not as a manufacturer but for the calculation of thermal bridges related to fixings. The system used for this project is a double aluminium rail syst...

READ MORE

CE Marking – EN 1090 certification

  • 2.03.2022

Following our constant improvement of our quality policy, we have successfully applied to the EN 1090-2 Standard that concerns production and quality control. The compliance with this new standard allows us to publish Declaration of Performance (or D...

READ MORE

Anchoring on wooden frames

  • 7.09.2021

Timber construction is an important trend in recent years. There are several reasons for this (list not exhaustive): It is an old, safe and proven technique It is a solution that allows a colossal saving of CO2 emissions linked to the construction ph...

READ MORE

Winter holidays

  • 1.12.2018

Fixinox offices will be closed from December 24th 2018 to January 7th 2019. Any requests during the winter break can be sent to info@fixinox.be Outside of these dates, the office will be running as usual, the Fixinox team remains at your service. 2.5...

READ MORE

One big precast project in Saclay – France

  • 16.07.2018

Cardinal Edifice is actually Buildin the future Institut Mines Telecom at the Saclay Campus that will host one of the best French universities, Fixinox delivers hundred of hangers and fixing system for precast panels. Also several custom designed anc...

READ MORE

Warning: Use of undefined constant sidebarnews - assumed 'sidebarnews' (this will throw an Error in a future version of PHP) in /home/clients/5536e775fea6b7dfc633a6d41d9a44c2/web/wp-content/themes/fixinox/tpl_news.php on line 48

Follow us!

Recent posts

  • Winter holidays

    1.12.2018


  • Formulaire de contact

      Name*

      Email*

      Entreprise*

      File

      Subject*

      Message*